PROJECT INFO

Client: Wongkok (Vic) Pty Ltd

Project Design:

Millar Merrigan

Contract Sum:  $1.2M

View PDF

ABOUT THE PROJECT

44 First Avenue Subdivision

44 First Ave is a 4.7 hectare residential subdivision consisting of 25 lots.

Entracon was contracted to construct all roads, drainage systems, sewer and water systems.

 

WORKS

  • The import of over 13,000m3 of fill
  • Over 1200 lineal metres of concrete driveways, kerb and pedestrian pavement
  • Preparation of and lay of asphalt road
  • Installation of all stormwater drainage, incl pipes, pits and culverts
  • Management of all contractors supplying and installing electrical, gas and sewer services.

 

KEY ASPECTS

  • Management of acid sulphate soil throughout works
  • Acid sulphate soils were present in the groundwater and soils, along with construction adjacent to significant wetlands required extensive environmental management and planning prior to and during construction.
  • Culturally significant site

 

Gallery