PROJECT INFO

Client: Satterley Property Group

Project Design:

Spiire

Contract Sum: $500K

ABOUT THE PROJECT

Arcadia Bridge Road Endwall

The construction of a large headwall into the Entracon built Melbourne Water Waterway, allowed for the diversion of existing table drains into a new set of DN2400mm, DN2100mm and DN900mm triple cell pipeline, feeding the NH02 waterway. The project was constructed only after the waterway was live, so sheet piling was required to avoid ingress of flows from the existing waterway and tight construction access adjacent to the active Bridge Road required the opposite excavation face to be sheet piled also.

 

WORKS

  • Concrete Works – headwall
  • Drainage – Triple cell drainage up to DN2400mm
  • Melbourne Water Rockwork

 

KEY ASPECTS

  • Sheet piling to prevent ingress of water from existing waterway
  • Sheet piling to allow for 5m deep excavation on edge of roadway
  • Suspension of Telstra Fibre cable
  • Working below groundwater table level

Gallery