Client: Satterley Property Group

Project Design:

Spiire

Contract Sum: $2.3M

ABOUT THE PROJECT

Arcadia Officer South Road Culverts

In order to facilitate the flow between NH02 and NH03 waterways, a triple cell culvert system was constructed, which also allowed for the future upgrade of Officer South Road into a major Arterial Road. The 50m of 3m wide by 1.5m high triple cell culvert system was designed to VicRoads standards, including wing walls 600mm thick.

 

WORKS

  • 50m of 3m wide by 1.5m high triple cell culvert system
  • High Voltage Electrical Relocation
  • High Pressure Gas Main Relocation
  • 600mm thick headwall and wingwalls
  • Construction of impact barrier

 

KEY ASPECTS

  • Construction of culverts in accordance to VicRoads specification
  • Realignment of HV Main and High Pressure Gas Main
  • Staged construction to facilitate asset relocations
  • Working below groundwater table
  • Working between two active waterways