ABOUT THE PROJECT
Blessington Street Outfall Drain
Works Include:
- Site Preparation including cleaning and stripping of base
- Sheet piling of temporary bund for protection for works
- Construction of twin 600dia relief drain
- Removal of existing end wall and construction of a new end wall
- Modification to an existing junction pit
- Reinstate rock seawall behind new structure
Key Aspects:
- Works undertaken within the high profile area of St Kilda Beach
- Construction works undertaken 1 m below water table
- Working within limited tide times
- Complex lifting and installation of a precast headwall constructed onsite by Entracon’s concrete team