PROJECT INFO

Client: City of Port Phillip

Project Design:

JDS Civil Designs

View PDF

ABOUT THE PROJECT

Blessington Street Outfall Drain

Works Include:

  • Site Preparation including cleaning and stripping of base
  • Sheet piling of temporary bund for protection for works
  • Construction of twin 600dia relief drain
  • Removal of existing end wall and construction of a new end wall
  • Modification to an existing junction pit
  • Reinstate rock seawall behind new structure

Key Aspects:

  • Works undertaken within the high profile area of St Kilda Beach
  • Construction works undertaken 1 m below water table
  • Working within limited tide times
  • Complex lifting and installation of a precast headwall constructed onsite by Entracon’s concrete team