PROJECT INFO
Client: City of Kingston
Project Design: Cardno
Contract Sum: $1.2M
ABOUT THE PROJECT
Bondi Road Outfall and Stormwater Pump Station BONBEACH
To reduce the impact of regular flooding in properties at the end of Bondi Road and other flooding impacts in the local area, Kingston City Council have been working to improve drainage at Bonbeach Reserve. Stage One of the works includes the construction of the pumping station
WORKS
- Construction of a 3.6m diameter x 10m deep concrete pumping station and valve pit
- Supply and installation of 2 x submersible pumps and all associated pipes, fitting and mechanical works
- Design and construct associated electrical works up to the main switchboard
KEY ASPECTS
- Installation of pump station via caisson method
- Working below sea level in sand
- Significant depth of excavation requiring specialised equipment and safety gear