PROJECT INFO

Client: Glen Eira City Council

Project Design:

TGM Group

Contract Sum:

0.7M

View PDF

ABOUT THE PROJECT

Booran Reservoir Decommission

Key Aspects

• Concrete demolition within a residential area
• Noise control
• Pedestrian/ Traffic Management
• Proximity of site to main road.

Works Include

• Mass concrete demolition
• Demolition of Earth embankments
• Bulk Earthworks
• Stormwater protection
• Tree and stump removal
• Protection of assets.
• Site dewatering