PROJECT INFO

Client: Yarra City Council

Project Design:

Cardno

Contract Sum:   $ 0.3M

 

View PDF

ABOUT THE PROJECT

Coulsons Reserve Drainage Outlet

Coulson reserve is a small reserve in Clifton Hill located along the Merri Creek that provides access to the Merri Creek trail. Unstable ground conditions, coupled with high rainfall events have meant that the existing drainage outlet into the Coulson Reserve Raingarden needs to be replaced and retaining wall constructed for the safety of public . Construction a gabion rock filled multiple tiered retaining wall and upgrading the outlet ensures flooding and the risk of landslides is mitigated.

 

WORKS

  • Construction of gabion retaining wall
  • Reconstruction of outlet pipe
  • Construction of rock beaching into the Merri Creek

 

KEY ASPECTS

  • Difficult / Steep terrain
  • Poor Subgrade
  • Environmental controls as adjacent to live waterway
  • Heavy metal and asbestos contamination