PROJECT INFO

Client: Gippsland Water

Project Design:

GHD

Contract Sum: $1.7M

View PDF

ABOUT THE PROJECT

Drouin Water Storage Basin Modification

As the Drouin area continues to expand, so does the need for available water storage. Entracon was engaged to modify the existing water storage basin #1, and construct a new earthen embankment to provide an additional 24 megalitre treated water storage basin known as Water Basin 1A.

WORKS

  • Bulk earthworks—Level 1 Filling
  • Construction of earthen embankment
  • Construction of new 24ML water basin
  • Pipework
  • Drainage systems
  • Access trade

KEY ASPECTS

  • Remote Worksite
  • Adverse weather conditions
  • Modifications to live mains
  • Deep excavation