PROJECT INFO

Client: Tamworth Regional Council

Project Design:

AECOM

Contract Sum: $0.7M

View PDF

ABOUT THE PROJECT

Dungowan Dam Crest Protection

Dungowan Dam sits approximately 50km from Tamworth and was built in 1957.The dam was raised in 1991/92 to increase its flood handling capacity and today can hold up to  6.3 gigalitres of water. In 2016, in keeping with new Dam Safety guidelines,  Tamworth Regional Council decided to further upgrade the risk protection of the dam. This included the construction of a 200 metre long, 6 metre wide reinforced concrete slab on top of the existing dam crest

 

WORKS

  • Lifting and Protection of Dam Crest
  • Construction is 200m long 6m wide reinforced concrete slab on top of existing dam crest
  • Installation of vehicle barrier

KEY ASPECTS

Construction of:

  • Remote location
  • Working in active waterway