ABOUT THE PROJECT
Saint Georges Dam Upgrade
Works Include:
• Removal of pedestrian footbridge over the primary spillway;
• Stripping and stockpiling of top soil;
• Excavation of the embankment
• Construction of the new spillway;
• Construction of the rockfill weir downstream of the secondary spillway chute;
• Construction of pedestrian access from the south to north extents of the site·
Key Aspects:
• Poor Site access
• Poor ground conditions
• Deep excavation
• Flood water level management
• Extreme weather conditions