ABOUT THE PROJECT
Torquay, Wet Weather Facility
Works Included:
- Construction of the emergency wastewater storage facility
- Connection of the overflow outlet into the existing manhole.
- Connection of the air vent into Pumping Station No. 5.
- Testing and commissioning of all items.
- Relocation of 200dia rising main.
Site Issues:
- Unknown service
- Bypass pumping of existing sewer flows.
- High profile Site.