PROJECT INFO

Client Representatives:: Barwon Water — Jim O’Neil

View PDF

ABOUT THE PROJECT

Torquay, Wet Weather Facility

Works Included:

  • Construction of the emergency wastewater storage facility
  • Connection of the overflow outlet into the existing manhole.
  • Connection of the air vent into Pumping Station No. 5.
  • Testing and commissioning of all items.
  • Relocation of 200dia rising main.

Site Issues:

  • Unknown service
  • Bypass pumping of existing sewer flows.
  • High profile Site.