PROJECT INFO

Client: Goulburn Valley Water

Project Design:

SKM Consulting

 

Contract Sum: $ 3.7 M

View PDF

ABOUT THE PROJECT

Sunday Creek Reservoir Spillway Upgrade, VIC.

Works Included:

  • Spillway upgrade.
  • Structural concrete works associated with raising the spillway wall ≈ 1200m3.
  • Construction of a weighting berm on the downstream face.
  • Construction of a filter drainage system on the downstream face and toe of the existing embankment.
  • Modifications to the existing outlet pipe, valve and pits.
  • Excavation of 30000m3 of graded material from onsite borrow pit for weighting berm.
  • Aquaseeding of embankments.

Site Issues:

  • Inclement weather.
  • Limited space for stockpiling of material.
  • Steep batter slopes, limiting access.
  • Theft and vandalism.