PROJECT INFO
Client: Satterley Property Group
Project Design:
Spiire
Contract Sum: $5.4M
ABOUT THE PROJECT
Arcadia NH02 Wetlands
Located in the fast growing suburb of Officer, Arcadia is one of the largest master-planned communities in Melbourne’s south east. The design was to create a new, wetland corridor to treat stormwater from the existing and upcoming land releases in the Arcadia estate. The wetland consists of pool and riffle sections providing a natural looking stormwater catchment system that along with shared pathways running the length of the system enhances the livability of the area.
WORKS
- Bulk Earthworks
- Installation of new drainage pipework and pits
- Construction of MWC rocked outfalls
- Construction of sediment pond with clay liner
- Rock work consisting of :
- Rock Beaching
- Rock batters
- Rock outfalls
- Rock Riffles
- Rock edging
- Construction of maintenance tracks
- Concrete works
KEY ASPECTS
- Management of extensive site stormwater
- Poor weather conditions
- Working with high natural groundwater level.